Draft v4 — internal red-team

Submission readiness

HELIOGRID — Self-healing distribution grids for high-penetration renewable regions

Readiness gate
AMBER
2 critical findings block a green gate
Aggregate score
12.4 / 15
+1.3 vs. previous draft
Unsupported claims
37
of 412 claims checked across 78 pages
Days to deadline
17
Call closes 2026-09-17 · RIA

Excellence

Threshold 3.0 · weight 1.0

Defensible
4.3/ 5
WP3 validation protocol lacks a stated control baseline.
  • Clarity & pertinence of objectives4.5
  • Soundness of methodology4.0
  • Beyond state of the art4.5
  • Interdisciplinarity & open science4.0
Criterion detail

Impact

Threshold 3.0 · weight 1.0

Vulnerable
3.6/ 5
Impact chain jumps from pilot to EU-wide rollout with no intermediate step.
  • Credibility of pathways to impact3.5
  • Scale & significance of contribution4.0
  • Exploitation & IPR measures3.0
  • Communication & dissemination4.0
Criterion detail

Quality & efficiency of implementation

Threshold 3.0 · weight 1.0

Defensible
4.5/ 5
Two partners overlap on grid simulation; one capability unowned.
  • Work plan coherence & effectiveness4.5
  • Capacity & role of participants4.0
  • Resource allocation & budget5.0
Criterion detail

Priority actions before submission

Every finding is mapped to a criterion, an owner and an evidence span.

All findings
  • F-001critical
    No named owner for exploitation after project end
    Impact → Exploitation & IPR measures · WP7 lead — NordVolt · 3 d
  • F-002critical
    WP3 validation lacks a control baseline
    Excellence → Soundness of methodology · WP3 lead — Aegean Institute · 5 d
  • F-003major
    Impact chain skips the intermediate scale step
    Impact → Credibility of pathways to impact · WP6 lead — Iberia DSO · 2 d
  • F-004major
    Capability 'regulatory & tariff analysis' has no lead partner
    Quality & efficiency of implementation → Capacity & role of participants · Coordinator · 4 d

Reviewer simulation

Divergence between personas is the risk signal — not the average.

  • Sceptical scientist3.8

    Methodology is credible but the WP3 baseline is undefined — I would cap Excellence at 4.0.

  • Impact & exploitation reviewer3.0

    No owner of the exploitation route after month 36. This is a threshold risk, not a polish item.

  • Budget / project manager4.6

    Effort distribution and cost categories are consistent with the work plan.

  • Red-team auditor3.4

    37 claims carry no citation. Half of them sit in the Impact section, where they matter most.

Score movement across drafts

Which fixes moved which criterion.

DraftExcellenceImpactImplementationTotal
v13.02.53.28.7
v23.62.83.810.2
v34.03.14.011.1
v44.33.64.512.4

Impact rose 1.1 points once the dissemination plan was costed — exploitation is still the drag.

Audit trail

Every scoring run and state change is recorded.

  • 2026-08-31 18:04Re-scored draft v4 against call topic textm.stavrou
  • 2026-08-31 17:52Ingested Call_topic_text.pdf (6 pages, indexed)system
  • 2026-08-31 17:40Marked F-006 resolved with evidence added on p.29l.moreno
  • 2026-08-31 16:11Red-team pass completed — 6 findings, 2 criticalsystem

Top projects on FundExcel

Opt-in profiles of high-scoring projects — including strong proposals the EU budget could not reach — and what each team needs next.

Open showcase
  • NEUROSAFE14.2 / 15

    Bedside screening for post-operative delirium

    Looking for: Clinical sites

  • HELIOGRID13.5 / 15

    Long-duration thermal storage for grid-scale solar

    Looking for: Pilot-line partner, Bridge funding

  • CIRCUWEAVE11.0 / 15

    Closed-loop recycling of technical textiles

    Looking for: Manufacturing partner, Angel round, Volunteers

  • AQUALOOP10.5 / 15

    Decentralised water reuse for peri-urban districts

    Looking for: Co-applicant, Crowdfunding

Designed Serendipity

The person, project, method or funding route you need may already exist in the network — neither side knows it yet. An explained, consent-gated matching layer across proposals, capabilities and calls.

Coming soon
  • Complementary teams found from structure, not keywords.
  • Transferable methods across domains and calls.
  • Every match explained, scored and contestable.
  • Compatibility disclosed before content — both sides consent.
Preview the concept