Call requirement → proposal span
Side-by-side analysis. A requirement without a quoted span does not count as addressed.
| Call requirement | Proposal span | Verdict |
|---|---|---|
Reduced outage duration in high-renewable distribution networks Call_topic_text.pdf p.3 | “Curtailment across the three demonstration regions reached 2.1 TWh in 2024.” Proposal_v4_PartB.pdf p.8 | Covered with evidence |
Credible route to replication beyond demonstration sites Call_topic_text.pdf p.6 | “Results will be adopted across European distribution networks.” Proposal_v4_PartB.pdf p.38 | Asserted, not evidenced |
Address regulatory and tariff barriers to flexibility services Call_topic_text.pdf p.4 | No span in any ingested document matches this requirement. | Not addressed |
Open science and FAIR data management Call_topic_text.pdf p.9 | “Data will be deposited in Zenodo under CC-BY-4.0, stewarded in T1.4.” Proposal_v4_PartB.pdf p.29 | Covered with evidence |
Expected outcome: measurable improvement against a stated baseline Call_topic_text.pdf p.3 | “Fault recovery time will be improved by at least 30% compared to current practice.” Proposal_v4_PartB.pdf p.21 | Asserted, not evidenced |
Evidence index
Every span cited anywhere in this workspace.
- Proposal_v4_PartB.pdfp. 44E-101critical
“The consortium will ensure that results are taken up by relevant market actors.”
Used in: No named owner for exploitation after project end
- Proposal_v4_PartB.pdfp. 21E-102critical
“Fault recovery time will be improved by at least 30% compared to current practice.”
Used in: WP3 validation lacks a control baseline
- Proposal_v4_PartB.pdfp. 38E-103major
“Results will be adopted across European distribution networks.”
Used in: Impact chain skips the intermediate scale step
- Call_topic_text.pdfp. 6E-104major
“Proposals are expected to demonstrate a credible route to replication beyond demonstration sites.”
Used in: Impact chain skips the intermediate scale step
- Call_topic_text.pdfp. 4E-105major
“Activities should address regulatory and tariff barriers to flexibility services.”
Used in: Capability 'regulatory & tariff analysis' has no lead partner
- Proposal_v4_PartB.pdfp. 57E-106minor
“Both TU Rhein and Politecnico contribute grid simulation expertise to WP4.”
Used in: Two partners duplicate grid-simulation role
- Proposal_v4_PartB.pdfp. 29E-107minor
“Data will be made open in line with FAIR principles wherever possible.”
Used in: Open-science section names no repository or data steward
- Call_topic_text.pdfp. 3E-201
“Expected outcome: reduced outage duration in distribution networks with high shares of variable renewables.”
Used in: Why this problem?
- Proposal_v4_PartB.pdfp. 8E-202
“Curtailment across the three demonstration regions reached 2.1 TWh in 2024 (ENTSO-E TP).”
Used in: Why this problem?
- Proposal_v4_PartB.pdfp. 14E-203
“The controller has been validated at TRL 4 in the national project SELFGRID-CY.”
Used in: Why this solution?
- Proposal_v4_PartB.pdfp. 18E-204
“Reconfiguration completes in 12 s versus 38 s reported by RESILIENT-DN (GA 101056xxx).”
Used in: Why innovative?
- Proposal_v4_PartB.pdfp. 57E-205
“Both TU Rhein and Politecnico contribute grid simulation expertise to WP4.”
Used in: Why this consortium?
Audit trail
Exportable record of every action on this project.
- 2026-08-31 18:04 · m.stavrouRe-scored draft v4 against call topic textHELIOGRID
- 2026-08-31 17:52 · systemIngested Call_topic_text.pdf (6 pages, indexed)Call documents
- 2026-08-31 17:40 · l.morenoMarked F-006 resolved with evidence added on p.29F-006
- 2026-08-31 16:11 · systemRed-team pass completed — 6 findings, 2 criticalHELIOGRID